Called Will Meenan at Kaman and talked about what to do with the broken KD2300. He said the only thing now is to just send it back for repair, which will cost $500.
Discussed the RR results with Brad and Paul J. Now that the 4000A accels are back we will redo the RR with those accels. First the circuit needs to modified to account for their dynamics.
I also conducted the DC temperature test on all 4 measurement specialties accelerometers. This test was done to see the deviation of sensitivity at different temperatures.
While doing the temp test I improved the GUI I made to plot DCS data. It works pretty well now, however I'm sure there are still a few kinks to work out.